Friday 2 February 2018 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Jan 31 to perform a full-frame dark current readout of the Aspect Camera Assembly CCD during a standard one-hour comm pass. This was a demonstration of a new operational concept to obtain dark current data more frequently than the current cadence of four times per year. A second real-time procedure was executed on Jan 31 to swap the prime solid-state recorder (SSR) from the B-side to the A-side. This swap concludes a six-month interval of health and trending data collection on SSR-B. The schedule of targets for the next week is shown below and includes an observation of Swift J164449.3+573451 coordinated with the VLA, and observations of NGC 300 ULX-1, which was accepted as a Director's Discretionary Time Target of Opportunity on Jan 26. |
------------------------------------------
SDSSJ105310.82+5016 ACIS-S Feb 5
PG1116+215 HRC-S /LETG
SwiftJ164449.3+5734 ACIS-S
Radiation Belts Feb 6
NuSTARJ151253-8124.3 ACIS-S
J1254+2104 ACIS-S
PG1116+215 HRC-S /LETG
SwiftJ164449.3+5734 ACIS-S Feb 7
PG1116+215 HRC-S /LETG
SDSSJ140025.40+3149 ACIS-S
E0102-72 ACIS-S
NGC300ULX-1 ACIS-S Feb 8
PSRJ1809-1917 ACIS-I
Radiation Belts
NGC2243 ACIS-S Feb 9
NVSSJ162830+115403 ACIS-S
PG1116+215 HRC-S /LETG
PSRJ1809-1917 ACIS-I
PG1116+215 HRC-S /LETG Feb 10
PSRJ1809-1917 ACIS-I
PG1116+215 HRC-S /LETG
SDSSJ154824.01+3335 ACIS-S Feb 11
Radiation Belts
NGC300ULX-1 ACIS-S
NGC2243 ACIS-S
SwiftJ164449.3+5734 ACIS-S
PSRJ1809-1917 ACIS-I Feb 12
PG1116+215 HRC-S /LETG------------------------------------------
All spacecraft subsystems continued to support nominal operations.