CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 9 March 2018 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Mar 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes an observation of SN 2018gk which was accepted as a Target of Opportunity on Feb 13. |
------------------------------------------
Radiation Belts
E0102-72 ACIS-S
E0102-72 ACIS-I
NGC3585 ACIS-S Mar 13
SN1987A ACIS-S/HETG
NGC3585 ACIS-S Mar 14
SDSSJ131121.32+2227 ACIS-S
SN2018gk ACIS-S
Radiation Belts Mar 15
SN1987A ACIS-S/HETG
NGC3585 ACIS-S
Mrk59 ACIS-S
PSRJ1605-5257 ACIS-S Mar 16
PSRJ2032+4127 ACIS-S
Mrk59 ACIS-S
Radiation Belts Mar 17
DDO68 ACIS-S
NGC3393 ACIS-S Mar 18
SN1987A ACIS-S/HETG------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

