News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 7 February 2020 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Feb 1 to swap the prime solid-state recorder (SSR) from the B-side to the A-side. This swap concludes a six-month interval of health and trending data collection on SSR-B. Another real-time procedure was executed on Feb 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of AT2019rwd, which are follow-ups to a Target of Opportunity which was accepted on Oct 17 and are coordinated with NuStar, observations of V4641 Sgr, which were accepted as Targets of Opportunity on Feb 5 and are coordinated with Swift and LCO-FTP, and an observation of SN2020oi, which was accepted as a Director's Discretionary Time Target of Opportunity on Jan 21.



------------------------------------------
        70OPH                  HRC-I        Feb  9
        A1240                  ACIS-I
        AT2019rwd              ACIS-S       Feb 10
        A1240                  ACIS-I
        SDSSJ1104+4345         ACIS-S
        Radiation Belts                     Feb 11
        AT2019rwd              ACIS-S
        A1240                  ACIS-I
        AT2019rwd              ACIS-S
        J080707.2+352130.3     ACIS-S       Feb 12
        E0102-72               ACIS-I
        PSO167-13              ACIS-S
        E0102-72               ACIS-S       Feb 13
        Radiation Belts
        V4641Sgr               ACIS-S/HETG
        Radiation Belts                     Feb 14
        J102106.4+360408.8     ACIS-S
        SN2020oi               ACIS-S
        E0102-72               ACIS-S
        V4641Sgr               ACIS-S/HETG  Feb 15
        [BGK2006]HV19          ACIS-I
        PSO167-13              ACIS-S
        Radiation Belts                     Feb 16

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports