CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 8 January 2021 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jan 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Additional real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next week is shown below and includes an observation of GRB201214B, which was accepted as a Director's Discretionary Time Target of Opportunity on Dec 16. |
------------------------------------------
2MASSJ15345704-1418 ACIS-S Jan 10
3CR399.1 ACIS-S
J092429.9+514301.2 ACIS-S
3CR399.1 ACIS-S Jan 11
2MFGC6625 ACIS-S
GRB201214B ACIS-S
Radiation Belts Jan 12
SDSSJ232326.17-0100 ACIS-S
ColdECSBlankSky HRC-S
2MASSJ07424841+2704 ACIS-S
2MFGC6625 ACIS-S Jan 13
M82X-2 HRC-I
H1821+643 HRC-S /LETG
NGC3104 ACIS-I
2MFGC6625 ACIS-S
SN2009gj ACIS-S Jan 14
SN2013F ACIS-S
Radiation Belts
MGJ0414+0534 ACIS-S Jan 15
H1821+643 HRC-S /LETG
2MASSJ09503674+5128 ACIS-S
2MFGC6625 ACIS-S Jan 16
H1821+643 HRC-S /LETG
GraL0659+16 ACIS-S
UGC04491 ACIS-S Jan 17
Radiation Belts------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

