CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 5 February 2021 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Feb 1 to swap the prime solid-state recorder (SSR) from the B-side to the A-side. This swap concludes a six-month interval of health and trending data collection on SSR-B. Real-time procedures were also executed on Feb 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next week is shown below and includes an observation of NGC454E coordinated with NuSTAR. |
------------------------------------------
HIP67522 ACIS-S Feb 7
H1821+643 HRC-S /LETG
MOOJ1046+2758 ACIS-I Feb 8
H1821+643 HRC-S /LETG
MOOJ1046+2758 ACIS-I
M33-North ACIS-I Feb 9
H1821+643 HRC-S /LETG
MOOJ1046+2758 ACIS-I
Radiation Belts Feb 10
PSRJ1813-1749 ACIS-S
E0102-72.3 ACIS-S
DELSJ092347.12+0402 ACIS-S
H1821+643 HRC-S /LETG Feb 11
J100758.26+211529.2 ACIS-S
H1821+643 HRC-S /LETG
Radiation Belts Feb 12
PSRJ2030+4415 ACIS-I
J100758.26+211529.2 ACIS-S Feb 13
PSRJ2030+4415 ACIS-I
G21.5-09 HRC-I
H1821+643 HRC-S /LETG
J100758.26+211529.2 ACIS-S Feb 14
DELSJ092347.12+0402 ACIS-S
NGC454E ACIS-S
DELSJ092347.12+0402 ACIS-S
Radiation Belts Feb 15------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

