Friday 19 March 2021 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Mar 13 to reenable the Thermal Primary Operational Bus 6 after it had been disabled on Mar 8. The data collected during this interval will allow an assessment of the thermal benefit of turning off the associated heaters and indicate whether a permanent disable is appropriate. Of note this week, the Chandra Cycle 23 proposal deadline was Mar 16 at 6pm EDT. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts Mar 21
G104.52+01.24 ACIS-I
HZ43 HRC-S /LETG
G104.52+01.24 ACIS-I
M87Halo2 ACIS-S
H1821+643 HRC-S /LETG Mar 23
M82X-2 HRC-I
SDSSJ1138+0314 ACIS-S
H1821+643 HRC-S /LETG
Radiation Belts Mar 24
PSZ2G282.28+49.94 ACIS-I
PSRJ0821-4300 HRC-S /LETG Mar 25
PKS1136-135 ACIS-S
SNR1987A HRC-S /LETG
PKS1136-135 ACIS-S Mar 26
H1821+643 HRC-S /LETG
Radiation Belts Mar 27
JWST-DTDF-1 ACIS-I
MCG-1-22-006 ACIS-S Mar 28
PKS1136-135 ACIS-S
3FGLJ1016.5-6034 ACIS-I------------------------------------------
All spacecraft subsystems continued to support nominal operations.