News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 2 July 2021 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

The schedule of targets for the next week is shown below and includes an observation of QSOJ1131-1231 coordinated with XMM.



------------------------------------------
        Radiation Belts                     Jul  5
        SDSS_J135225.80+1328   ACIS-S
        NGC2336-N              ACIS-S
        Radiation Belts
        NGC2336-S              ACIS-S
        RXJ1856.5-3754         ACIS-S/LETG  Jul  6
        WISEJ080822.18-6443    ACIS-S
        hetej1900.1-2455       ACIS-S       Jul  7
        WISEJ080822.18-6443    ACIS-S
        NGC6860                ACIS-S/HETG
        Radiation Belts                     Jul  8
        NGC4485/90             ACIS-S
        PSRJ1852+0040          ACIS-S
        NGC2336-N              ACIS-S       Jul  9
        PSRJ1852+0040          ACIS-S
        NGC2336-S              ACIS-S
        hetej1900.1-2455       ACIS-S       Jul 10
        QSOJ1131-1231          ACIS-S
        MRK417                 ACIS-S
        Radiation Belts                     Jul 11
        GDH7                   ACIS-I
        GDH7                   ACIS-I
        GDH7                   ACIS-I
        GDH7                   ACIS-I
        GDH7                   ACIS-I
        PSRJ0821-4300          HRC-S /LETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports