Friday 22 October 2021 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Oct 15 to update several telescope subsystem K-constants related to the insertion and retraction of gratings in order to account for spacecraft thermal trends. Additional real-time procedures were executed on Oct 15-17 to dump OBC-A and -B memory as a follow-up to the patch. The dump will be used to update the baseline memory images maintained on the ground. The schedule of targets for the next week is shown below and includes an observation of MAXI J1848-015, which was accepted as a Target of Opportunity on Aug 25 and is coordinated with VLA, and an observation of eRASSt J234403.0-352640, which is a follow-up to a Target of Opportunity accepted on May 11. |
------------------------------------------
Radiation Belts Oct 24
MAXIJ1848-015 ACIS-S Oct 25
SDSSJ011623.04+14294 ACIS-S
MAXIJ1848-015 ACIS-S
PSRB2224+65 ACIS-I
RMJ020146.6+182552.6 ACIS-I Oct 26
MOOJ1059+5454 ACIS-I
LEDA3096766 ACIS-I
Radiation Belts Oct 27
SNR1987A ACIS-S/HETG
2RXSJ022824.3+05380 ACIS-S Oct 28
SNR1987A ACIS-S/HETG
RMJ022905.6+043003.1 ACIS-I
2RXSJ021157.9+04214 ACIS-S
SNR1987A ACIS-S/HETG
eRASStJ234403.0-352 ACIS-S Oct 29
DESJ040559.80-33085 ACIS-S
Radiation Belts Oct 30
2MASSJ04351354+2008 ACIS-S
PG1115+080 ACIS-S
2MASSJ04351354+2008 ACIS-S
[MOK2016b]HSCJ0921 ACIS-S Oct 31
DELSJ041128.63-0907 ACIS-S
SNR0519-69.0 ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

