CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 5 November 2021 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Nov 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Chandra passed through the first, second, and third eclipses of the season on Oct 29, Nov 1 and Nov 4 respectively, with nominal power and thermal performance. The schedule of targets for next week is shown below and includes an observation of ERO_TDE_1, which was accepted as a Director's Discretionary Time Target of Opportunity on Oct28. |
------------------------------------------
WISEAJ060841.40+422 ACIS-S Nov 8
NGC253 ACIS-I
PSRJ2030+4415 ACIS-I
CasA (6 times) ACIS-I
ABELL262SE2 ACIS-I
Radiation Belts Nov 9
SDSSJ125300.15+5248 ACIS-S
CasA (4 times) ACIS-S
2RXSJ023548.1+34410 ACIS-S
RXJ1053.7+5735 ACIS-S Nov 10
B2.20410+26 ACIS-S
ERO_TDE_1 HRC-I
B2.40401+23 ACIS-S Nov 11
RXJ1053.7+5735 ACIS-S
2RXSJ034423.4+28122 ACIS-S
Radiation Belts Nov 12
DELSJ041128.63-0907 ACIS-S
4U1626-67 ACIS-S/HETG
S82X-1065 ACIS-I
4U1626-67 ACIS-S/HETG Nov 13
GaiaDR271487329756 ACIS-S
RXJ1053.7+5735 ACIS-S
B2.10302+31 ACIS-S
PSRB2224+65 ACIS-I Nov 14
Radiation Belts------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

