CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 6 January 2023 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jan 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes an observation of SDSSJ163810.07+1151 coordinated with the Hobby-Eberly Telescope. |
------------------------------------------
Radiation Belts Jan 9
SDSSJ163810.07+1151 ACIS-S
SDSSJ144706.81+2128 ACIS-S
SDSSJ074922.96+2255 ACIS-S
SRGEJ170245.2+13010 ACIS-S
IRAS09104+4109 ACIS-S Jan 10
NGC5127 ACIS-S
UGC03995A_s2 ACIS-S
SRGEJ170245.2+13010 ACIS-S
IRAS09104+4109 ACIS-S Jan 11
PSZ2G063.38+53.44 ACIS-I
SDSSJ101747.09+3932 ACIS-S
Radiation Belts Jan 12
2MASSJ08194059+0823 ACIS-I
SRGEJ170245.2+13010 ACIS-S
SDSSJ082758.52+23330 ACIS-S
SRGEJ170245.2+13010 ACIS-S
DELSJ091054.53-0414 ACIS-I
SDSSJ151727.68+1333 ACIS-S Jan 13
SDSSJ144624.29+1731 ACIS-S
2MASSJ08194059+0823 ACIS-I
ESO223-006 ACIS-I
eFEDSJ091453.6+0416 ACIS-S
SDSSJ085443.10+0752 ACIS-S
LEDA3078020 ACIS-S
eFEDSJ091453.6+0416 ACIS-S Jan 14
SPT-CLJ0311-6354 ACIS-I
Radiation Belts
RXJ0806.4-4123 ACIS-I
eFEDSJ091453.6+0416 ACIS-S Jan 15
RXJ0806.4-4123 ACIS-I
[GMV2015]ASW0009io9 ACIS-S
SWIFTJ0722.5+2121 ACIS-I
CXOUJ232327.8+58484 ACIS-S------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports

