CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 7 July 2023 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jul 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes observations of AT2022tsd, which are follow-ups to a Target of Opportunity which was accepted on Oct 7, 2022. |
------------------------------------------
TrifidNebula ACIS-S/HETG Jul 10
2MASSJ14184746+3028 ACIS-S
Radiation Belts
2RXSJ200417.9-26195 ACIS-S
AT2022tsd ACIS-S Jul 11
QSOJ0041-4936 ACIS-I
QSOJ0041-4936 ACIS-I
2MASSJ20100002-2801 ACIS-S Jul 12
AT2022tsd ACIS-S
Abell2744 ACIS-I
Radiation Belts Jul 13
CrA ACIS-I
WOLF437 HRC-I
A2319 ACIS-I
XIBOO HRC-I Jul 14
CrA ACIS-I
SDSSJ140701.59+1904 ACIS-S
2MASSJ14184746+3028 ACIS-S
TrifidNebula ACIS-S/HETG Jul 15
WOLF437 HRC-I
CrA ACIS-I
Radiation Belts Jul 16
AT2022tsd ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

