CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 3 May 2024 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on May 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the CPE. The schedule of targets for the next week is shown below and includes an observation of V1723Sco, which was accepted as a Director's Discretionary Time Target of Opportunity on Apr 12. |
------------------------------------------
HE1338-1423 HRC-S /LETG May 5
eFEDSJ083933.8-0140 ACIS-S May 6
PKS1418-064 ACIS-S
SDSSJ075438.45+4232 ACIS-S
Radiation Belts May 7
V1723Sco ACIS-S/HETG
SNRG21.5-0.9 HRC-S
WISEAJ122612.12+244 ACIS-S
TXS1834+612 ACIS-S May 8
PSZ2G000.04+45.13 ACIS-I
PSZ2G356.53+28.66 ACIS-I
E0102-72.3 ACIS-I
NGC6242 ACIS-I May 9
PROCYON HRC-I
IC4518A ACIS-S
Radiation Belts
LMCDeepField03 ACIS-I
SC1329-313 ACIS-I May 10
E0102-72.3 ACIS-S
SC1329-313 ACIS-I
SDSSJ133857.08+3635 ACIS-S May 11
SNRG21.5-0.9 HRC-I
SDSSJ090920.44+0044 ACIS-S
SC1329-313 ACIS-I
SDSSJ085711.68+0124 ACIS-S
SC1329-313 ACIS-I May 12
Radiation Belts
SC1329-313 ACIS-I
PSZ2G178.94+56.00 ACIS-I
SC1329-313 ACIS-I------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

