CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 5 July 2024 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jul 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes an observation of SS 433 coordinated with Swift. |
------------------------------------------
m28 HRC-S Jul 8
CSWA28 ACIS-I
m28 HRC-S
A1795 ACIS-I
XMMUJ183314.2-09210 ACIS-I Jul 9
Radiation Belts
SPT-CLJ2249-5528 ACIS-I
PSRJ1101-6101 ACIS-I Jul 10
PSZ2G018.84+22.43 ACIS-I
SS433 HRC-I
SNRG018.9-01.1 ACIS-I Jul 11
NSA91579 ACIS-S
SNRG018.9-01.1 ACIS-I
NSA91579 ACIS-S
Radiation Belts Jul 12
Mrk1018 ACIS-S/HETG
SS433e0 ACIS-I Jul 13
HD16673 HRC-I
PSZ2G114.90-34.35 ACIS-I
SS433e0 ACIS-I
XIBOO HRC-I
PSRJ1101-6101 ACIS-I Jul 14
HEPG012.702-01.132 ACIS-I
Radiation Belts------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

