CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 9 August 2024 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Aug 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes an observation of AT2024qfm, which was accepted as a Target of Opportunity on Aug 1 and is coordinated with NuSTAR. |
------------------------------------------
PSRJ2021+3651 ACIS-S Aug 11
1E2215.7-0404/1E ACIS-I Aug 12
Radiation Belts Aug 13
1E2215.7-0404/1E ACIS-I
SDSSJ033553.12-0039 ACIS-S
LMCDeepField08 ACIS-I
1E2215.7-0404/1E ACIS-I Aug 14
LMCDeepField07 ACIS-I
VIKINGJ231818.3-311 ACIS-S
4U1624-490 ACIS-S/HETG Aug 15
Radiation Belts
AT2024qfm ACIS-S
NGC6242 ACIS-I Aug 16
2RXSJ213736.6-20255 ACIS-S
4U1624-490 ACIS-S/HETG
VIKINGJ231818.3-311 ACIS-S Aug 17
PGC170437 ACIS-S
SDSSJ162549.66+4806 ACIS-S
PSRJ2021+3651 ACIS-S
Radiation Belts Aug 18
1E2215.7-0404/1E ACIS-I
SDSSJ111836.35+6316 ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

