CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 3 April 2026 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Apr 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes an observation of EP260321a, which was accepted as a Target of Opportunity on Mar 26, and an observation of AT 2025aarm, which was accepted as a Director's Discretionary Time Target of Opportunity on Mar 30. |
------------------------------------------
EP260321a ACIS-S Apr 5
PSZ2G071.21+28.86 ACIS-I Apr 6
Abell2255 ACIS-I
NGC4540 ACIS-S
VLSSrJ031859.0+5755 ACIS-I
NGC4540 ACIS-S Apr 7
VLSSrJ031859.0+5755 ACIS-I
NGC4540 ACIS-S
VLSSrJ031859.0+5755 ACIS-I
Radiation Belts Apr 8
VLSSrJ031859.0+5755 ACIS-I
NGC2566 ACIS-S
ANUMa ACIS-S/HETG
2RXSJ080121.5+59025 ACIS-S
NGC4941 ACIS-S Apr 9
1RXSJ021649.0+70355 ACIS-I
NGC4941 ACIS-S
1RXSJ021649.0+70355 ACIS-I
NGC4941 ACIS-S Apr 10
1RXSJ021649.0+70355 ACIS-I
Radiation Belts
MKN421 ACIS-S/LETG
RGB_J0710p591_s1 ACIS-S Apr 11
NGC4540 ACIS-S
1RXSJ021649.0+70355 ACIS-I
NGC5728 ACIS-S
AT2025aarm ACIS-S
NGC5728 ACIS-S
AM2107-474 ACIS-S Apr 12
NGC5728 ACIS-S
AM2107-474 ACIS-S
2MASXJ07233444-5610 ACIS-S
SDSSJ093401.24+2453 ACIS-S
Radiation Belts------------------------------------------
All spacecraft subsystems except HRC-S continued to support nominal operations.