Friday 7 August 2026 9.00am EDT
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Jul 31 to swap the prime solid-state recorder (SSR) from the B-side to the A-side. This swap concludes a six-month interval of health and trending data collection on SSR-B. Additional real-time procedures were executed on Aug 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Chandra passed through the 6th and 7th eclipses of the season on Aug 2 and 4 respectively, with nominal power and thermal performance. The schedule of targets for the next week is shown below and includes an observation of EP J223759.5+531421, which was accepted as a Director's Discretionary Time Target of Opportunity on Jul 14, and an observation of TDE 2025aarm, which was accepted as a Director's Discretionary Time Target of Opportunity on Jul 28. |
------------------------------------------
Radiation Belts Aug 10
SDSSJ125354.49+2624 ACIS-S
PSOJ308.0416-21.233 ACIS-S
2RXSJ161659.7-31363 ACIS-S
NGC1358 ACIS-S Aug 11
NGC1358 ACIS-S
2MASXJ22373491-1925 ACIS-S
PerseusclusterN ACIS-I
SDSSJ220153.56-08344 ACIS-S Aug 12
PerseusclusterN ACIS-I
2MASXJ22373491-1925 ACIS-S
Radiation Belts Aug 13
PerseusclusterS ACIS-I
2MASXJ22373491-1925 ACIS-S
PerseusclusterS ACIS-I
2MASXJ22373491-1925 ACIS-S Aug 14
TDE2025aarm ACIS-S
SDSSJ222203.73-09271 ACIS-S
PerseusclusterS ACIS-I
PSOJ308.0416-21.233 ACIS-S Aug 15
Radiation Belts
PerseusclusterS ACIS-I
Mrk915 ACIS-S Aug 16
EPJ223759.5+531421 ACIS-S
PerseusclusterN ACIS-I
NGC424 ACIS-S------------------------------------------
All spacecraft subsystems except HRC-S continued to support nominal operations.
Return to Status Reports

