Friday 14 August 2026 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Chandra passed through the 8th (and final) eclipse of the season on Aug 7, with nominal power and thermal performance. Real-time procedures were executed on Aug 8 to disable SCS-29 and to dump and clear the EPS glitch counters as post-eclipse season actions. Of note this week was the announcement on Aug 13 of the Cycle 28 Peer Review recommended programs. For details see: https://cxc.harvard.edu/target_lists/cycle28 A Chandra photo release was issued on Aug 9 describing observations of the Tarantula Nebula. Located in the Large Magellanic Cloud, the Tarantula has thousands of young stars embedded in a vibrant honeycomb-like structure of gas and dust. The new composite image contains X-ray data from NASA’s Chandra X-ray Observatory, infrared data from NASA’s James Webb Space Telescope, and optical data from NASA’s Hubble Space Telescope. The X-ray data reveal gas blown away by winds from the surfaces of young, massive stars and heated to millions of degrees by shock waves. For details, see: https://chandra.harvard.edu/photo/2026/30dor/ The schedule of targets for the next week is shown below, and includes an observation of NGC 1358 coordinated with NuSTAR. |
------------------------------------------
SWIFTJ2157.4-3316 ACIS-I Aug 17
TWA7 HRC-I /HETG
NGC7213 ACIS-S/HETG
[vD2023]1 ACIS-I
Radiation Belts Aug 18
MaNGA8982-9101 ACIS-S
TIC466376085 HRC-I
TVCassiopeia ACIS-S/HETG
TIC466376085 HRC-I Aug 19
SN2023ixf ACIS-S
SN1986J ACIS-S
TIC466376085 HRC-I
SN2023ixf ACIS-S
PSRJ1813-1246 ACIS-I Aug 20
SNRG1.9+0.3 ACIS-S
Radiation Belts
NGC7213 ACIS-S/HETG Aug 21
ACT-CLJ0307.0-0628 ACIS-S
G29-38 HRC-I
ClGJ0242-2132 ACIS-S
NGC1358 ACIS-S
G29-38 HRC-I Aug 22
NGC7378 ACIS-S
SDSSJ014837.63+0600 ACIS-I
SDSSJ013341.22-0109 ACIS-S
Radiation Belts Aug 23
NGC7213 ACIS-S/HETG------------------------------------------
All spacecraft subsystems except HRC-S continued to support nominal operations.
Return to Status Reports

