News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 1 September 2006 9.00am EDT

During the last week the observing schedule was replanned to include an observation of SGR 1806-20 that was accepted as fast turn-around Target Of Opportunity (TOO) on August 30. Loads were replanned and uplinked on August 31. An observation of B2224+65 was impacted by the TOO and will be rescheduled in a later load.

The schedule of targets for next week is shown below and includes an observation of XTE J1810-197 coordinated with ground-based observations.

------------------------------------------
Radiation Belts                      Sep 3
RS Oph                  HRC-S/LETG   Sep 4
M33 Field 2             ACIS-I
SDSS J0750+4252         ACIS-S       Sep 5
WR20a                   ACIS-I
SDSS J0803+3022         ACIS-S       Sep 6
Radiation Belts
RS Oph                  HRC-S/LETG
M33 Field 2             ACIS-I       Sep 7
RXC J1147.3+5544        ACIS-S
1RXS J140654.5+525      ACIS-S       Sep 8
RS Oph                  HRC-S/LETG
Radiation Belts
P14                     ACIS-I       Sep 9
P4                      ACIS-I
P3                      ACIS-I
P2                      ACIS-I
NGC 4194                ACIS-S
NGC 5474                ACIS-S       Sep 10
XMMU J2235.3-2557       ACIS-S
XTE J1810-197           ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports