Operations CXO Status Report

Friday 16 April 2004 9.30am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was completed on Apr 15 to update the on-board ephemeris.

The schedule of targets for the next week is shown below and includes a Director’s Discretionary Time observation of the Gamma Ray Burst source GRB031203.

------------------------------------------
GRB031203              ACIS-S       Apr 18
Cassiopeia A           ACIS-S
Radiation Belts                     Apr 19
LMC X-3                ACIS-S/LETG
Cassiopeia A           ACIS-S       Apr 20
Radiation Belts                     Apr 22
Cassiopeia A           ACIS-S
Radiation Belts                     Apr 24
Cassiopeia A           ACIS-S       Apr 25
Sculptor Dwarf         ACIS-S       Apr 26

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports