Friday 5 June 2009 8.00am EDT

During the last week Chandra completed the observing schedule as planned. Chandra passed through the first three eclipses of the 2009 summer eclipse season on May 28, Jun 2 and 4 with nominal power and thermal performance.

A real-time procedure was executed on Jun 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes an observation of GRO J1655-40 coordinated with the Australia Telescope Compact Array.

------------------------------------------
Radiation Belts                    Jun  7
MACSJ0416.1-2403       ACIS-I
1RXSJ082124.5-362848   ACIS-S      Jun  8
GRO J1655-40           ACIS-S
Abell 2052             ACIS-S
NGC 6300               ACIS-S      Jun  9
Abell 2052             ACIS-S
Radiation Belts
EXO0748-676            ACIS-S      Jun 10
NGC 6300               ACIS-S
Abell 2052             ACIS-S      Jun 11
MS0735.6+7421          ACIS-I
Radiation Belts                    Jun 12
GRB 090417B            ACIS-S      Jun 13
MS0735.6+7421          ACIS-I
NGC 6300               ACIS-S      Jun 14

------------------------------------------

All spacecraft subsystems continued to support nominal operations.