| During the last week Chandra completed the observing schedule as planned.
Real-time procedures were executed on Nov 1 in preparation for the start of the 2010 summer eclipse season: one to activate SCS 29 and one to dump and clear the EPS glitch counters. Chandra passed through the first and second eclipses of the season on Nov 2 and 5 respectively, with nominal power and thermal performance. A second real-time procedure was executed on Nov 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A third real-time procedure was completed on Nov 4 to update the on-board ephemeris. The schedule of targets for the next week is shown below and includes an observation of XB 1832-330 that was accepted as a Target of Opportunity on Nov 3 and an observation of Eta Car coordinated with HST. |
------------------------------------------
Radiation Belts Nov 7
XB1832-330 ACIS-S/LETG Nov 8
1718-649 ACIS-S Nov 9
ESO501-G023 ACIS-S
Pi3Ori HRC-S/LETG
Radiation Belts Nov 10
PuppisANEfilament ACIS-I
NGC4839 ACIS-I Nov 11
G299.2-2.9 ACIS-I
RXJ1131-1231 ACIS-S
31Com HRC-I Nov 12
J192607.1+505252 ACIS-S
AqlX-1 ACIS-S
J190822.7+385101 ACIS-S
Radiation Belts
PuppisANEfilament ACIS-I Nov 13
G299.2-2.9 ACIS-I
J194759.9+413111 ACIS-S Nov 14
M31 HRC-I
A2249 ACIS-I
EtaCar ACIS-S/HETG------------------------------------------
All spacecraft subsystems continued to support nominal operations.