Friday 4 March 2011 9.00am EST
| During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Mar 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Mar 2 to update the on-board ephemeris. The schedule of targets for the next week is shown below and includes observations of SIX-2 and SIX-4 that are coordinated with a ground-based observatory. |
------------------------------------------
Radiation Belts Mar 6
XMMUJ1243+1313&J1 ACIS-S Mar 7
SIX-2 ACIS-I
SDSSJ1252+2640 ACIS-S
AKARI-NEP-DeepField ACIS-I
AKARI-NEP-DeepField ACIS-I
PSRJ1958+2846 ACIS-I Mar 8
3C410 ACIS-S
AKARI-NEP-DeepField ACIS-I
M31 HRC-I
AKARI-NEP-DeepField ACIS-I
1RXSJ130205.2+155122 ACIS-S Mar 9
PSS1326+0743 ACIS-S
1RXSJ144701.1+11453 ACIS-S
GZ_merger_AGN_12 ACIS-I
Radiation Belts
AKARI-NEP-DeepField ACIS-I
SIX-4 ACIS-I Mar 10
Abell3112 ACIS-I
BR0351-1034 ACIS-S
A853 ACIS-I
Abell1668 ACIS-S Mar 11
A1795 (4 obs) ACIS-I
Radiation Belts Mar 12
A1795 (2 obs) ACIS-I
A1882a ACIS-S
NGC3393 ACIS-S Mar 13
ACTJ0215-5212 ACIS-I Mar 14
SN1987A ACIS-S/HETG------------------------------------------
All spacecraft subsystems continued to support nominal operations.