Friday 6 January 2012 9.00am EST
During the last two weeks Chandra completed the observing schedule as planned. A real-time procedure was executed on Dec 31 to re-initialize the flight software Thruster Command Processing subfunction in order to prevent the occurrence of an overflow condition. A second real-time procedure was executed on Jan 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A third real-time procedure was executed on Jan 5 to update the on-board ephemeris. The schedule of targets for the next week is shown below and includes an observation of SN2011ja, which was accepted as a Target of Opportunity on Dec 27, an observation of PTF11qcj, which was accepted as a Director's Discretionary Time TOO on Dec 27, and an observation of UZTauE_P1 coordinated with OVRO/CARMA. |
------------------------------------------
SDSSJ1558-0031 ACIS-S Jan 8
IC2497 ACIS-S
Mrk3 ACIS-S Jan 9
HZ43 HRC-S/LETG
SDSSJ1543+3359 ACIS-S
Q2237+0305 ACIS-S
Radiation Belts Jan 10
SN2011ja ACIS-S
HD134987 ACIS-S
IC2497 ACIS-S
SDSSJ095948.59+3449 ACIS-S Jan 11
SDSSJ1150+2819 ACIS-S
2MASXJ09043699+5536 ACIS-S
Crab ACIS-S Jan 12
UZTauE_P1 ACIS-S
E0102-72S3 ACIS-S
E0102-72S2 ACIS-S
A2204_Field1 ACIS-I
Radiation Belts
PTF11qcj ACIS-S Jan 13
PSS0926+3055 ACIS-S
2QZClus1004+00 ACIS-I
G228.49+53.12 ACIS-I Jan 14
E0102-72I3 ACIS-I
SPT-CLJ0151-5954 ACIS-I
E0102-72S1 ACIS-S Jan 15------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports