Operations CXO Status Report

Friday 4 December 2015 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Dec 2 perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below



------------------------------------------
        Radiation Belts                     Dec  4
        NGC741                 ACIS-S
        Radiation Belts                     Dec  5
        NGC741                 ACIS-S
        Mrk104                 ACIS-S
        A1795                  ACIS-S
        202059222              ACIS-S       Dec  7
        PSZ2G209.79+10.23      ACIS-I
        Perseuscluster (3 obs) ACIS-I
        J085125.81+393541.7    ACIS-S
        NGC2208                ACIS-S
        Mrk1230                ACIS-S
        Radiation Belts                     Dec  8
        30Doradus              ACIS-I
        ProximaCen             HRC-I        Dec  9
        30Doradus              ACIS-I
        Perseuscluster (6 obs) ACIS-I
        ChandraDeepField-S     ACIS-I
        Radiation Belts                     Dec 11
        30Doradus              ACIS-I
        Perseuscluster         ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports