CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 3 February 2017 9.00am EST
During the last week the observing schedule was replanned to remove the grating from the observation of 4U 1630-47. A real-time procedure was executed on Feb 1 to swap the prime solid-state recorder (SSR) from the B-side to the A-side. This swap concludes a six-month interval of health and trending data collection on SSR-B. A second real-time procedure was executed on Feb 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below and includes GRS 1716-249, which was accepted as a Director's Discretionary Time Target of Opportunity on Jan 31, and iPTF17cw, which was accepted as a Director's Discretionary Time Target of Opportunity on Jan 23. |
------------------------------------------
Radiation Belts Feb 6
GRS1716-249 ACIS-S/HETG
NGC4206 ACIS-S
LEDA87445 ACIS-I
NGC3600 ACIS-S Feb 7
IRAS17020+4544 HRC-S /LETG
NGC4220 ACIS-S
IRAS17020+4544 HRC-S /LETG Feb 8
iPTF17cw ACIS-S
Radiation Belts Feb 9
Abell586 ACIS-I
NGC3583 ACIS-S
IRAS17020+4544 HRC-S /LETG
NGC4411b ACIS-S
LEDA87445 ACIS-I Feb 10
spog5260 ACIS-S
IRAS17020+4544 HRC-S /LETG
Abell586 ACIS-I
Radiation Belts Feb 11
Abell586 ACIS-I
NGC4237 ACIS-S Feb 12
CygnusA-Nucleus ACIS-I------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

